Reference List  of Deaerators

SCOPE OF SUPPLY NAME OF Project Year CLIENT LOCATION
No 2 Thermophysical Deaerators
Q = 477 T/h, HEI standard
2X 120 MW RIO
TURBIO POWER PLANT
‘10
ISOLUX
Patagonia -Argentina
No 1 Thermophysical Deaerator
Q = 370 T/h
Yajva Power Plant
‘09
CMI
Russian Federation
No 1 Thermophysical Deaerator
Q =213 T/h
SINES REFINERY
CONVERSION PROJECT
‘09
TECNICAS REUNIDAS
Portugal
No 1 Thermophysical Deaerator
Q = 226 T/h
Sulfuric  Acid Unit
TIFERT PROJECT
‘09
TECHNIP
Tunisia
No 3 Thermophysical Deaerator
Q = 1240 T/h each , HEI standard
360 MW Coal Fired Power Plants
PECEM & ITAQUI
‘09
WALTER TOSTO
Brazil
No 1 Thermophysical Deaerator
Q = 407 T/h , HEI standard
430 MW Combined Power Plant
DUNAMENTI
‘09
CMI
Hungary
No 1 Thermophysical Deaerator
Q = 474 T/h , HEI standard
430 MW Combined Power
Plant BLENOD
‘09
CMI
France
No 1 Thermophysical
Deaerator Q = 1360T/h
Saudi Aramco
Khursaniyah Plant
‘09 MISA Saudi Arabia
No 1 Thermophysical Deaerator

Q = 400T/h

Nevinnomysskaya

420 MW Power Plant

‘09 ENEL Russian Federation
No 1 Thermophysical

Deaerator Q = 400T/h

Ansaldo Energia

Bayet Plant

‘08 NOOTER ERIKSEN France
No 1 Thermophysical

Deaerator Q = 400T/h

Enel Marcinelle Plant ‘08 NOOTER ERIKSEN Belgium
No 1 Thermophysical

Deaerator Q = 400T/h

Ansaldo Energia

S. Severo Plant

‘08 NOOTER ERIKSEN Italy
No 1 Thermophysical

Deaerator Q = 400 T/h

ENEL

Livadia Plant

‘08 NOOTER ERIKSEN Greece
No 1 Thermophysical

Deaerator Q = 400 T/h

Edison

Thisvi Plant

‘08 NOOTER ERIKSEN Greece
No 1 Thermophysical

Deaerator Q = 240 T/h

SRC REFINERY

PROJECT

‘08 SRC Singapore
No 2 Thermophysical Deaerators

Q = 409 T/h each HEI standard

KONIAMBONICKEL

PROJECT

‘08 HATCH -TECHNIP JV New Caledonia
No 1 Thermophysical Deaerator

Q = 534 T/h HEI standard

ROPP  PROJECT PT

PERTAMINA

‘08 PT  REKAYASA Indonesia
No 2 Thermophysical

Deaerators Q = 402 T/h each

QAFCO 5 PROJECT ‘08 SAIPEM / SNAMPROGETTI Qatar
No 1 Thermophysical

Deaerator

Q = 277.8 T/h

QAFCO 5 PROJECT ‘08 SAIPEM / SNAMPROGETTI Qatar
No 1 Thermophysical

Deaerator Q = 3.63 T/h

QAFCO 5 PROJECT ‘08 SAIPEM / SNAMPROGETTI Qatar
No 1 Thermophysical

Deaerator Q = 90 T/h

INA RIJEKA REFINERY PROJECT ‘08 CB&I Croatia
No 1 Thermophysical

Deaerator

Q = 300 T/h HEI standard

GRUPA LOTOS

Program 10+ U&O

‘08 FLUOR Poland
No 1 Thermophysical

Deaerator

Q = 1.23T/h

Qatargas Common

SulfurProjectPlant

‘08 WGIWashington Group International Qatar
No 2 Thermophysical Deaerators

Q = 82.5 T/h each HEI standard

PTT Utility Co.

CUP III Plant

‘08 CTCICorporation Thailand
No 1 Thermophysical

Deaerator Q =65 T/h

PTTPE

LDPE Plant Project

‘08 TOYO Thailand
No 5 Thermophysical Deaerators

Q = 300T/h each

ISKENDERUN

Demir Ve Celik

AS Steel Plant

‘08 ISDEMIR Turkey
No 1 Thermophysical

Deaerator Q = 380T/h

ANZOATEGUI

VENEZUELA PLANT

‘08 SUPERMETANOL Venezuela
No 2 Thermophysical Deaerators

Q = 431 T/h each

PULAU SERAYA

SIEMENS POWER PLANT

‘08 SIEMENS Singapore
No 1 Thermophysical

Deaerator

Q = 61 T/h

60 MW

NUH ENERJI PLANT IZMIT

‘08 WCI Turkey
No 1 Thermophysical Deaerator

Q = 130 T/h

VLORE COMBINED CYCLE POWER PLANT ‘08 NOOTER ERIKSEN Albania
No 3 Thermophysical Deaerators

Q = 220 T/h & 240 T/h

PTT Utility Co.CUP III Plant ‘07 CTCI Thailand
No 1 Thermophysical Deaerator

Q = 850 T/h HEI standard

El Kureimat III

750 MW Combined Cycle Project

‘07 INITEC ENERGIA Egypt
No 1 Thermophysical Deaerator

Q = 570 T/h

ENGRO ENVEN 1.3 –DAHARKI SITE EXP. PRJ. ‘07 SAIPEM / SNAMPROGETTI Pakistan
No 2 Thermophysical Deaerators

Q = 214 T/h each

PULAU SERAYA

SIEMENS POWER PLANT

‘07 JEL Singapore
No 2 Thermophysical Deaerators

Q = 1000 T/h eachHEI standard

EL TEBBIN 800 MW

COMBINED CYCLE PROJECT

‘07 WALTER TOSTO Egypt
No 2 Thermophysical Deaerators

Q = 1031T/h  eachHEI standard

RAS ABU FONTAS PLANT ‘07 NOOTER ERIKSEN Qatar
No 1 Thermophysical Deaerator

Q = 150 T/h

SULPHURIC ACIDPLANT

MOA BAY

‘07 SNC LAVALIN Cuba
Thermophysical Deaerator integrated type

Q = 407 T/h  HEI standard

REPOWERING

AMERCOEUR 1

‘07 CMI Belgium
No 1 Thermophysical Deaerator Q = 17.8 T/h THERMAL OXIDIZER UNIT Plant ‘07 BATEMAN Israel
No 1 Thermophysical Deaerator

Q = 454 T/h  HEI standard

PTT Utility Co.

CUP II Plant ( HRSG)

‘06 GTB ENG. Thailand
No 1 Thermophysical Deaerator

Q =62.8 T/h  HEI standard

PTT Utility Co.

CUP II Plant( Auxiliary)

‘06 GTB ENG. Thailand
No 1 Thermophysical Deaerator

Q = 690 T/h HEI standard

El Kureimat II

750 MW Combined Cycle Project

‘06 SKODA PRAHA Egypt
No 1 Thermophysical Deaerator

Q = 690 T/h HEI standard

New Talkha

750 MW Combined Cycle Project

‘06 SKODA PRAHA Egypt
No 1 Thermophysical Deaerator

Q = 31T/h

Qatargas Common Sulfur

ProjectPlant

‘06 WGIWashington Group International Qatar
No 1 Thermophysical Deaerator

Q = 46 T/h

Hydrogen Production

Pavlodar PetroUnit

‘06 KOCH GLITSCH   AS Kazakhstan
No 1 Thermophysical Deaerator

Q = 10.3 T/h

Hydrogen Production

Plant Pavlodar Petroch.

‘06 KOCH GLITSCH   AS Kazakhstan
No 2 Thermophysical Deaerators

Q = 696 T/h each

Petrovietnam Dung Quat

Refinery project

‘06 TECHNIP / JGC / TR JV Vietnam
No 2 Thermophysical Deaerators

Q = 400 T/h each

Petrovietnam Dung Quat

Refinery project

‘06 TECHNIP / JGC / TR JV Vietnam
No 1 Thermophysical Deaerator

Q = 156 T/h

Saudi Aramco Rabigh

PC2 Prj.-KSA

‘06 MITSUI Saudi Arabia
No 1 Thermophysical Deaerators

Q = 650 T/h each-HEI standard

AKG-2

Project

‘06 CHIYODATECHNIP JV Qatar
No 4 Thermophysical Deaerators

Q = 650 T/h each-HEI standard

Rasgas

Expansion Prj.Plant

‘06 CHIYODATECHNIP JV Qatar
No 2 Thermophysical Deaerators

Q = 900 T/h each

Olefins 2

OL2K Project

‘05 FLUOR  BV Kuwait
No 1 Thermophysical Deaerator

Q = 2200 T/h

Escravos

EGTL Project

‘05 KBR HALLIBURTON Nigeria
No 2 Thermophysical Deaerators

Q = 516 T/h each

Tangguh

LNG Off-Shore

‘05 JGC KBRJV Indonesia
No 6 Thermophysical Deaerators

Q = 743 T/h each

Qatargas III

Expansion Prj. Plant

‘05 CHIYODA TECHNIP JV Qatar
Thermophysical Deaerator

Q = 130 T/h

TCP

New CogenPlant

‘05 GTB ENG. Thailand
No 5 Thermophysical Deaerators

Q = 743 T/h each-HEI standard

Qatargas II

Expansion Prj.

‘05 CHIYODA TECHNIP JV Qatar
Thermophysical Deaerator

Q = 500 T/h-HEI standard

Aroma 3

Mai Liao Plant

‘05 FORMOSA CHEMICALS Taiwan
Thermophysical Deaerator

Q = 50 T/h

TPI Project ‘05 GTB ENG. Thailand
Thermophysical Deaerator

Q = 31 T/h-HEI standard

WHRB UFA

NEFTECHIM

‘04 FOSTER WHEELER ITALIANA Russian Federation
Thermophysical Deaerator

Q = 45.6 T/h-HEI standard

SAR II Mai Liao

Plant

‘04 FORMOSA PLASTICS Taiwan
Thermophysical Deaerator integrated type

Q = 422.5 T/h-HEI standard

Teverola Energia

HRSG Plant

‘04 FOSTER WHEELER ITALIANA Italy
Thermophysical Deaerator

Q = 305 T/h-HEI Standard

ERG Petroli

ERGMED Project

‘04 FOSTER WHEELER ITALIANA Italy
No 2 Thermophysical Deaeratorsintegrated type

Q = 447 T/h

Va Tech Elin

HRSG Termoli Plant

‘04 NOOTER ERIKSEN Italy
Thermophysical Deaerator

Q = 54.6 T/h

Saudi Aramco

Riyadh Project

‘04 TECHNIP Saudi Arabia
No 2 Thermophysical Deaerators

Q = 450 T/h each

ISKENDERUN

Demir Ve Celik

AS Steel Plant

Comments are closed.